My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000343
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2010 8:54:01 AM
Creation date
3/26/2007 10:28:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150147
Contractor Name
Quint, Victor and Margie
Contract Type
Loan
Water District
0
County
Morgan
Washington
Bill Number
MC4
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />rKlIM <br /> <br />\ r K I j J U 1'1 L ( t. U U ,j :J ' ~l (j I ;) I . :J,:) I / I~ U' O,j U ( 0 U ~ :) 0 ~ r ~ <br /> <br />eweR Construction FuDd Loan Application <br /> <br />lfYES. please explain. <br /> <br />7. Please list the names and addmIses of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS and PHONE <br />CJJdr/f!S Lf!tLF' ..59.3'$ Rd, R, ~,C%, $67C/1 <br />1)a.. I'll ~Row I\. d./S' w, Q.a.k S-i-ttle.e.:f, f>.o,A~ ~) Ft. (!() 1/.' "'SJ~I <br />S'oS'-"L <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progras <br />for the proposed project. Please submit one copy of each completed study with tlUs application _ <br /> <br />/ III ~ It 0'1 r e.. S S b ~ t\ ye. '" 1- N .+ -r-,' D If} <br /> <br />9, Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costS. if'known. <br /> <br />Estimated Engineering Costs: $_ <br /> <br />Estimated Construction Costs: $ 9 ~ 0 DO. iJ i~ <br /> <br />Estimated Total Costs: $ <br /> <br />10. Loan amoWlt and tenns you are requesting, <br />Requested Loan Amount $ C}/S I 000. t1 i) (U9lIIIJy 75,," O(~ TotlII Costs) <br />. <br /> <br />Term (length) ofJoan: .a () years (Usually 10. 20. or 3O)'&!IID) <br />Interest Rate: ~,7!:J- % (Plt:asealll for our CIIMIlt rates) <br /> <br />'al1 C. - Projtd SpoDlOr YmAllCiallDlonnation <br /> <br />Because the CWCB ConstlUction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity, It is also <br />requested that the project sponsor submit with this application copies of the two mOlt receut annual <br />npoI1s, rlll8R(W statemeots, corponde reports or orher current documentation of financial condition <br />and operations, <br /> <br />1. List any existing liability or indebtedness that eKceeds one thousand doUars. For example, bank <br />loans, government agency loans, bond issues, accounts payabl~ etc, Include names and addresses <br />of lenders, amount~ due dates and maturity dates, Attach B separate scheduk; ifneeded, <br /> <br />Ranaining Annual Maturity <br />
The URL can be used to link to this page
Your browser does not support the video tag.