My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150111 Approval letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150111 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:00:34 AM
Creation date
3/26/2007 10:25:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150111
Contractor Name
Akron, Town of
Contract Type
Loan
Water District
1
County
Washington
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Town of Akron- Well and Pipeline Construction <br />September 11-12, 2002 <br /> <br />Agenda Item 12c <br /> <br />As security for the loan the Town of Akron will pledge water revenues backed by a rate covenant <br />and annual financial reporting. This is in compliance with CWCS Loan Policy #5 (Collateral). <br />During the period 2003-2005, the period when the CWCS loan and the Y-W Electric loans overlap, <br />CWCS would not have a parity position and would be in a second position to Y-W Electric in terms <br />of Water Fund revenue proceeds. <br /> <br />Staff is satisfied that loan conditions would meet the requirements of CRS Sec. 37-60-120, which <br />requires the State to take sufficient security interest in the project to assure repayment of loan <br />funds. The Town's Water Fund revenues have increased approximately $65,000 since receipt of <br />the Y-W Electric Loan in 1996. Also, the Town of Akron is a municipal borrower with strong ability <br />to pay both loans, and the period during which the CWCS loan would be subordinate to Y-W <br />Electric is fairly short, a maximum of three years. <br /> <br />Recommendation <br /> <br />Staff recommends a CWCS Small Project Loan, not to exceed $349,799, to the Town of Akron from <br />the Construction Fund to construct two new wells and raw water transmission lines connecting to their <br />existing water supply system. The recommended term of the loan is 30 years and the recommended <br />lending rate is 3.75%. Security for the loan will be a pledge of water rate revenues backed by a rate <br />covenant and annual financial reporting. <br /> <br />Staff further recommends that final approval of the loan be conditioned upon all other standard <br />contracting provisions of the CWCS. <br /> <br />cc: Anne Sowin, Town Manager, Town of Akron <br />Linda Bassi, AGO <br /> <br />Attachment <br /> <br />Action Taken bv the CWCS on September 12. 2002 <br /> <br />The CWCS approved the Staff Recommendation with the following revisions: <br /> <br />1. Clarification was added that the loan is being made to the Town of Akron, acting <br />through its Water Enterprise Fund. <br /> <br />2. A condition was added that the Town will provide formal evidence that Y-W Electric <br />Company has agreed to grant CWCS parity status on those annual Water Fund <br />revenues in excess of $230,000. <br /> <br />Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.