My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150111 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150111 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:00:34 AM
Creation date
3/26/2007 10:25:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150111
Contractor Name
Akron, Town of
Contract Type
Loan
Water District
1
County
Washington
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C\VCB Construction Fund Loan Application <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br /> <br />NAlVffi <br /> <br />ADDRESS and PHONE <br /> <br />Charles F. Leaf. PhD. PE 59365 WCR R - Merino. CO 80741 (970)522~1829' <br />William B. Paynter, Jr. P.O. Box A - Akron, CO 80720 (970)345-2219 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Town of Akron Northern Raw Water Transmission Pipeline Expansion <br /> <br />and Operational Analysis (February 2001) <br /> <br />9. Estimated cost of the proj ect. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ 2712.00 <br />$ 386087.00 <br />$ 388799.00 <br /> <br />10. Loan amount and terms you are requesting. <br /> <br />Requested Loan Amount: $ <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />349,799.00 <br />30 <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />years (Usually 10, 20, or 30 years) <br /> <br />3.75 <br /> <br />% (please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit "vith this application copies of the two most recent <br />annual reports, rmancial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. <br /> <br />CFlA602 <br /> <br />Appendix D - pg. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.