My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150111 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150111 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:00:34 AM
Creation date
3/26/2007 10:25:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150111
Contractor Name
Akron, Town of
Contract Type
Loan
Water District
1
County
Washington
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. Legal services for reviewing engineering services contracts, reviewing_ this <br />Contract, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br /> <br />SECTION 9 - DISBURSEMENT SCHEDULE <br /> <br />The BORROWER shall prepare a periodic progress report which contains a <br />statement of the PROJECT costs expended for that period and shall forward said <br />statement to the CWCB. After receipt of the periodic progress report from the <br />BORROWER, and review and acceptance of the items therein as eligible expenses <br />as described below, the CWCB will pay to the BORROWER the amount set forth in <br />the report or such portion that has been approved by the CWCB. Such payment <br />shall be made within thirty (30) days from the CWCB's approval of each progress <br />report. <br /> <br />SECTION 10 - TIME FOR PERFORMANCE <br /> <br />PROJECT Beginning: Upon Effective Date of this Contract <br /> <br />PROJECT Finish: Two (2) years from the Effective Date of this Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.