My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150195 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150195 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 3:51:20 PM
Creation date
3/26/2007 10:25:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150195
Contractor Name
Lower Sacramento Creek Reservoir Company
Contract Type
Loan
Water District
23
County
Park
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Summary <br />- Lower Sacramento Creek Reservoir Company- <br />Contract No. C150195 <br />SECTION 1 -BORROWER INFORMATION <br />Name: Lower Sacramento Creek Reservoir Company <br />Address: 2525 S. Wadsworth Blvd., No. 306, Lakewood, CO 80227 <br />Federal Identification No.: 84-1090279 <br />Contact: William M. Blatchley, SecretaryiTreasurer & General <br />Manager <br />Phone Number: (303) 989-6932 Fax Number: (303) 989-9446 <br />E-mail address:wmblatch@earthlink.net <br />Type of Entity: a Colorado nonprofit corporation <br /> <br />Section 2 - Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used to install a liner and enlarge the Lower Sacramento Creek Reservoir to its <br />decreed storage amount, located in Park County, hereinafter referred to as the <br />PROJECT, at an estimated total cost of $495,072. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Feasibility of Reconstruction of the Lower Sacramento <br />Creek Reservoir," dated January 2005, compiled by William M. Blatchley, which is <br />incorporated herein by reference, and, based upon the feasibility report, the CWCB <br />determined the PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB'SAUTHORITY <br /> <br />Construction Fund: This loan is made pursuant to the provisions of 9937-60-119 and <br />37-60-120, C.R.S., which authorize the CWCB to loan money for water projects from <br />the CWCB Construction Fund for the benefit of the people of the state, provided that <br />the borrower assures repayment of that money. <br /> <br />Section 37-60-122(1 )(b) C.R.S., authorizes the CWCB to make loans of up to <br />$5,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br /> <br />SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> <br />At its March 22, 2005 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $371,300 for PROJECT costs, not to <br />exceed 90% of the cost of the PROJECT, with a loan origination fee of 1 % in accordance with <br />CWCB Policy No. 16, at an interest rate of 3.75% per annum for a repayment term of 20 <br />years. <br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br /> <br />No existing debt <br /> <br />Appendix 1 to Loan Contract C150195 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.