My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150228 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150228 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 3:00:45 PM
Creation date
3/26/2007 10:25:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150228
Contractor Name
Riverside Irrigation District
Contract Type
Loan
Water District
0
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />economical manner. <br /> <br />14. BORROWER'S Liability Insurance. <br /> <br />a. Because the BORROWER is a "public entity" within the meaning of the Colorado <br />Governmental Immunity Act, CRS 24-10-101, et seq., as amended ("Act"), the <br />BORROWER shall at all times maintain such liability insurance, by commercial policy <br />or self-insurance as is necessary to meet its liabilities under the Act. <br /> <br />b. Prior to the disbursement of any loan funds, the BORROWER shall provide the CWCB <br />with an Acord Form 25 or other form satisfactory to the CWCB evidencing said <br />insurance and shall provide the CWCB with documentation of renewals of said <br />insurance. <br /> <br />15. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Contract Requirement (Section 6) of the Project Summary. <br /> <br />B. PROJECT PROVISIONS <br /> <br />1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br />BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 7) of the Project Summary. <br /> <br />2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 8) of the Project <br />Summary. <br /> <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 9) of the Project Summary. <br /> <br />4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />complete the PROJECT within the time specified in Time for Performance (Section 10) of <br />the Project Summary. <br /> <br />5. Indemnification By The Construction Firm. The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the STATE and the BORROWER <br />against all liability and loss, and against all claims and actions based upon or arising <br />out of damage or injury, including death, to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PROJECT or by conditions created thereby, or based upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br /> <br />6. Liability Insurance During Construction. During construction of the PROJECT, the <br />BORROWER shall require the construction firm(s) and any subcontractors to maintain the <br />following insurance coverage in the limits shown during the term of their contracts for <br />the construction of the PROJECT. The BORROWER shall provide the CWCB with an <br />Acord Form 27 evidencing said insurance prior to commencement of construction, <br /> <br />Loan Contract C150228 <br />Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.