My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000301
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 11:09:13 AM
Creation date
3/26/2007 10:24:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150129
Contractor Name
South Side Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L. The BoRROwER shall pay all of the expenses related to the PRO�ECr when such bills <br />are due. <br />SECTION 9— ELIGIBLE EXPENSES The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PRO�ECT. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BoRROwER . <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PRO�ECT pursuant to Paragraph A.2 herein. <br />I. Legal services for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />SECTION 1 O— DISBURSEMENT SCHEDULE <br />The BoRROwER shall prepare a periodic progress report which contains a statement of <br />the PRO�ECT costs expended for that period and shall forward said statement to the <br />CWCB. After receipt of the periodic progress report from the BoRROwER, and review <br />and acceptance of the items therein as eligible expenses as described below, the <br />CWCB will pay to the BoRROwER the amount set forth in the report or such portion that <br />has been approved by the CWCB. Such payment shall be made within thirty (30) days <br />from the CWCB's approval of each progress report. <br />SECTION 11 — TIME FOR PERFORMANCE <br />PRO�ECT Beginning: Upon Effective Date of this Contract <br />PRO�ECT Finish: Two (2) years from the Effective Date of this Contract <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.