Laserfiche WebLink
South Side Irrigation Company <br />January 22-23,2003 <br />Agenda Item 19d <br />Updated January 24, 2003 <br />Water Project Construction Loan Program-Project Data <br />Borrower: South Side Irrigation Company <br />Project Name: South Side Ditch <br />Drainage Basin: South Platte River <br />Total Project Cost: $80,000 <br />Type of Borrower: Agricultural/Municipal <br />CWCB Loan: $72,000 <br />CWCB Grant: $5,000 <br />County: Larimer <br />Project Type: Rehabilitation <br />Water Source: Big Thompson River <br />Funding Sources: CWCB and Company <br />Median Household Income: Average <br />Blended Interest Rate: 3.1 % Term: 30 years <br />Acre-Feet Diverted: 1,587 acre-feet <br />The South Side Irrigation Company operates the South Side Ditch for delivery of irrigation water <br />within a 499 1590-acre service area. The ditch is 11 miles long and its headgate is located on the <br />Big Thompson River 4 miles west of Loveland. This project includes rehabilitation of a number of <br />hydraulic structures, and lining portions of the ditch. Rehabilitation work is scheduled for fall 2003. <br />John Gauthiere P.E. has completed the feasibility study. Proposed funding for the project <br />consists of a$72,000 Small Project Loan and a$5,000 Feasibility Study Grant from the CWCB, <br />and the remainder from the Borrower. <br />Location Map <br />4 <br />