My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000300
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:50:10 AM
Creation date
3/26/2007 10:24:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150129
Contractor Name
South Side Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www. cwcb. s tate. co. us <br />January 28, 2003 <br />John Whiteside, President <br />South Side Irrigation Co. <br />1612 West 1 St Street <br />Loveland, CO 80537 <br />Dear John, <br />Re: Ditch rehabilitation <br />Loan approval <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Rod Kuharich <br />CWCB Director <br />Dan McAuliffe <br />Deputy Director <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your request for a Small Project Loan. The loan is for rehabilitation of the South <br />Side Ditch. <br />The Board approved a loan from the Construction Fund in an amount of $72,000 at the <br />loan terms of 3.1 % for 30 years or 2.9% for 20 years. The approval includes the provision <br />for a 1%($720) loan service charge, which may be paid at closing, or financed along with <br />the loan. I have attached a copy of the updated Board memo concerning the South Side <br />Irrigation Company. Please refer to page 3 of that memo and to the section "Action taken <br />by the CWCB January 23, 2003." <br />When the Board approved this loan it attached several conditions: <br />1. A Feasibilitv Studv is reauired. John Van Sciver will continue to work with John <br />Gauthiere P.E. to ensure that the study meets the requirements of the CWCB <br />Construction Fund Guidelines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.