My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000299
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 3:31:55 PM
Creation date
3/26/2007 10:23:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150090
Contractor Name
Parker Water and Sanitation District
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
HB 02-1152
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />Date <br />PROMISSORY NOTE <br />November 14, 2002 <br />� <br />Borrower: Parker Water and Sanitation District, acting by and <br />through its Water Activity Enterprise and its Sanitary <br />Sewer Activity Enterprise <br />Principal Amount: Fifteen Million Dollars ($ 15,000,000.00) <br />Interest Rate: 4.5% per annum <br />Term of Repayment: 20 years <br />Loan Contract No. : C150090, dated November 14, 2002 <br />Minimum Loan Payment: One Million One Hundred Fifty Three Thousand One Hundred <br />Forty Two and 16/100 Dollars ($1,153,142.16) <br />Payment Initiation Date '`: <br />Maturity Date*: <br />O��fo,���- /� z.o/o <br />OC �"o.b¢_.r / , �a v� 4 <br />" These finro fields are frUed in when the Payment Initiation Date is established by agreemenf of <br />the parties. <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br />Board ("CWCB"), from the sources provided in the Loan Contract, the Principal Amount plus <br />Interest for the Term of Repayment, pursuant to the Lo,�w CoNT�CT. <br />2. Principal and interest shall be payable in equal Minimum Loan Payments, with the first <br />payment due and payable one year from Payment Initiation Date, which shal� occur within 120 <br />calendar days following disbursement of the total Principal Amount of the loan but no later <br />than four years from the date the contract was signed by the State Controller, and annually <br />thereafter until all principal, interest, and late charges, if any, have been paid in full, with ail <br />such principal, interest, and late charges, required to be paid on or before the Maturity Date. <br />3. This promissory note is issued and delivered pursuant to portions or Supplemental Public <br />Securities Act, constituting Title 11, Article 57, Pa�t 2, C.R.S. (the "Supplemental Act"). <br />Pursuant to Section 11-57-210 of the Supplemental Act, such recital shall be conclusive <br />evidence of the validity and the regularity of the issuance of this promissory note after its <br />delivery for value. <br />4. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. <br />5. The CWCB may impose a late charge in the amount of 5% of the annua( payment if the <br />CWCB does not receive the annual payment within 15 calendar days of the due date. <br />6. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change <br />the amount of such payments. <br />7. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br />8. This Note is issued pursuant to the LoAN CorvTRaCT between the CWCB and the BoRROwER. <br />A��endix 2 to Loa� Contrac# C'f �009� <br />
The URL can be used to link to this page
Your browser does not support the video tag.