Laserfiche WebLink
<br />, <br /> <br />Parker Water and Sanitation District <br />November 26,2001 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desjqn and Construction Administration Procedures. <br />Tim Feehan will contacted you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. . <br /> <br />:~~J- <br /> <br /> <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: Parker 1101 mmo <br /> <br />cc (w/Atlachment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: Projects\Proj-New\Parker 1101 Ltr <br />