Laserfiche WebLink
<br />,. <br /> <br />. , <br /> <br />-4.~ # <br /> <br />H. Pursuant to 1994 Colo. Sess. Laws, Section 1, Chapter 265, as amended in the 1995 <br />Colo. Sess. Laws, the Colorado General Assembly authorized CWCB to loan to the BORROWER an <br />amount not to exceed $750,500 for the PROJECT. <br /> <br />,~ ; i > " <br />~ "1' ->-). , <br />I. Remy Labrouche and Ruth A. Labrouche.,. stockholders Qt.t'1s8 BoRROWER, have agreed to <br /> <br />convey a .security ,interest to the STATE in certa.~(~€l{W Cf~J;lf;(~,-~*ihe'm as individuals as part of <br />the security for this loan. "i,..'.;:::)i:..' ....".. ji '4'. ~.~~.....< <br />;..~,.......~ <br />r .' t ')'~{h;"_.,. <br /> <br />J. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT <br />upon mutually agreeable terms and conditions. <br /> <br />NOW THEREFORE, in consideration ofthe mutual and dependent covenants contained, the <br />parties agree as follows: <br /> <br />A. The BORROWER agrees as follows: <br /> <br />.1. Construction Fund Program procedures. The following items are procedures the BORROWER <br />shall follow during the construction phase of the PROJECT rehabilitation. <br /> <br />a. The BORROWER shall employ an engineer, registered in the State of Colorado, hereinafter <br />referred to as the CONSULTANT, to prepare: plan@ a.ndisgecifications for the PROJECT. <br /> <br />1.<_ ." <br /> <br />b. The agreement between the,;BoR,HQWER and the CONSULTANT and the plans and <br />specifications must be submitted tOf)the~CW<;:'B".staff for verification of compliance with the <br />terms of thiS. contr~ct pr~~r to bid op.e. ning.L1~.... )...... ..... ..i.fi...C.... a. t.io...n..s.....to the plans and specifications <br />must be approved In writing by the sa~V .'., <br /> <br />c. For plans and specifications for allJ.iSd~ICt" a-~~. n~ reservoirs, as defined by ~ 37- <br />87-105 C.R.S. (1990), the BORROW~h . '~~iletter of approval from the State <br />Engineer's Office prior to construc,~ <br /> <br />d. CWCB staff must be present It bid opening and must approve the award of the <br />construction contract. <br /> <br />e. The BORROWER shall contract for the construction of the work with responsible and capable <br />firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be <br />selected by the BORROWER and found acceptable by the CWCB staff before work under this <br />contract begins. <br /> <br />f. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the advertisement for bid, contractor's proposal, construction contract, bid bond, <br />performance bond, payment bond, notice of award, notice to proceed, sample change order, <br />and sample field order. After the CWCB staff verifies that these documents comply with the <br />terms of this contract, the BORROWER may issue the notice to proceed to the CONSTRUCTION <br />FIRMS. <br /> <br />g. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff <br />shall have the opportunity to review and approve the construction schedule. <br /> <br />h. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by the CWCB <br />staff . <br /> <br />Vouga Reservoir Association <br /> <br />Page 2 of 1 2 <br /> <br />Loan Contract <br />