<br />.,..; <br /> <br />Ms. Honey R. Moschetti <br /> <br />-2- <br /> <br />December 22, 1995 <br /> <br />Task 1 - Identify Alternative Dam Safety Modification Concepts. We will evaluate potential dam safety <br />modification concepts and, with the concurrence ofthe Reservoir Con~_~~ct up to three alternatives <br />for feasi~ility evaluations. At this time we envision that the fOllowinrr.m.Ds would be studied: <br /> <br />Alternative No.l- Rehabilitation of the existing cres~re,~,.fjI?ai.r and rehabilitation <br />of the concrete and anchorage to the original dam se9l.~." .r U LL <br /> <br />Alternative No~'2 - Replacement of the 12-foot crest raise section with a new concrete section. <br /> <br />Alternative-No~No"'^''ction.This-alternarive-wiU consider the potential consequences that might <br />result from not repairing the dam. These consequences would be expected to include a permanent <br />reservoir restriction imposed by the SED, and the resulting loss of reservoir storage. <br /> <br />Task 2 - Develop Feasibility Designs of Alternatives. Feasibility designs of the alternative modification <br />concepts will be developed for the three alternatives selected in Task I. These designs will be developed <br />to a level sufficient to establish their technical and economic feasibility, and will include appropriate <br />analyses and illustrative drawings. <br /> <br />Task 3 - Develop Project Cost Evaluations. For each alternative studied, GEl will develop estimates of <br />project costs, including-opinions of probable design, construction administration, and construction costs. <br />We will also evaluate potential advantages and disadvantages (both technical and economic) of each <br />alternative. Project costs developed in this task are expected to be suitable for use in project budget planning <br />and for pursuit of project financing options. <br /> <br />Task 4 - Prepare Draft Report. We will prepare a Draft Feasibility Report summarizing the work <br />described in Tasks 1,2, and 3. This report will identify a preferred alternative to be carried into final design <br />and construction. The selection of the preferred alternative will be made with the concurrence of the <br />Reservoir Company. . <br /> <br />The Draft Feasibility Report will also include a discussion of potential permitting issues related to final <br />design and construction of the project. such as SED review and approval, and state and federal permit <br />requirements. <br /> <br />The Feasibility Report will be prepared in accordance with CWCB guidelines in anticipation of the Reservoir <br />Company's application to the CWCB for project funding through the Construction Loan Fund. <br /> <br />Task 5 - Reservoir Company and CWCB Review. We will present the Draft Feasibility Report to the <br />Reservoir Company for review and comment. After incorporating the Reservoir Company's comments, we <br />will present the draft report to the CWCB for review and comment. <br /> <br />Task 6 - Prepare Final Report. Following review by the Reservoir Company and the CWCB, GEl will <br />finalize the Feasibility Report to incorporate all review comments. The final report will then be submitted <br />to the Reservoir Company and the CWCB. We will also submit a copy of the final report to Mr. Mike <br />Graber with the SED in Pueblo to keep him apprised of the Reservoir Company's progress toward resolving <br />the dam safely issues at DeWeese Dam. <br />