My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000275
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:00:33 AM
Creation date
3/26/2007 10:20:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150144
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />--=:J7W <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />May 27, 2003 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr. Philip Mortensen, President <br />Upper Platte and Beaver Canal Co. <br />P.O. Box 581 <br />Brush, CO 80723 <br /> <br />Dan McAuliffe <br />Deputv Director <br /> <br />RE: Badger Creek Augmentation Project <br />Loan Approval <br /> <br />Dear Philip, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your request for a Small Project Loan from the Construction Fund. I understand <br />the loan will be used to construct a well augmentation project on Badger Creek. <br /> <br />The Board approved a loan from the. Construction Fund in a maximum amount of <br />$67,500 at the loan terms of 2.25% for 10 years. The approval includes the provision for a <br />1 % ($675) loan service charge, which may be paid at closing, or financed into the loan. I <br />have attached a copy of the updated Board memo concerning the Upper Platte and <br />Beaver Canal Company. Please refer to page 3 of that memo and to the section "Action <br />taken by the CWCB May 20, 2003." <br /> <br />When the Board approves a Small Project Loan from the Construction Fund there remain <br />several conditions: <br /> <br />a) A Feasihility Study is required We have reviewed the April 2003 study titled <br />"Feasibility of Construction of the Upper Platte and Beaver Canal Company <br />Badger Creek Augmentation Project" by Brent Nation, P.E., of Nation Engineering <br />Services, Inc. The report meets the requirements of the CWCB Construction Fund <br />Guidelines for feasibility studies, and has been accepted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.