My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150148 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150148 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:53:08 AM
Creation date
3/26/2007 10:15:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150148
Contractor Name
Ogilvy Irrigating and Land Company
Contract Type
Loan
Water District
3
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ogilvy Irrigation and Land Co. <br />July 28-29,2003 <br /> <br />Agenda Item 21c <br />(Updated August 4, 2003) <br /> <br />The Oailw Irriaation and Land Company <br />The OILC is a mutual ditch company and a non-profit corporation registered in the State of <br />Colorado. There are 34 shareholders and 360 shares of stock. The OILC has the power to set <br />annual assessments to be paid by the shareholders, the power to cut off water deliveries to <br />shareholders that fail to pay their assessments, and the power to offer stock for sale to pay <br />back assessments. <br /> <br />Water Riahts <br />The OILC holds a 1909 water right (Priority No.60) for storage in the Seeley Lake, in amount of <br />1542.7 acre-feet. Records of the State Engineer's Office (1987 - 2001) indicate that the annual <br />maximum storage has averaged about 1,100 acre-feet. <br /> <br />The Company also holds a direct flow water right in amount of 91 CFS out of the Cache La <br />Poudre River. Records of the State Engineer's Office (1998-2002) indicate that average annual <br />diversions have been about 16,000 acre-feet <br /> <br />Proiect Description <br />During the study of Seeley Lake Reservoir and Dam, the following alternatives were evaluated: <br /> <br />1) The no action alternative <br />2) Complete rehabilitation of the dam ($388,095) <br /> <br />Following is a summary of these alternatives: <br /> <br />No Action Alternative. <br />This alternative was rejected because of the potential for a storage restriction and ultimately the <br />loss of water rights if the dam is not repaired. <br /> <br />Alternative 2 - Complete rehabilitation of the dam <br />This alternative was selected because it addresses all safety issues, and assures that the <br />Company can continue to use the reservoir for storage of water. <br /> <br />Selected Alternative 2 This alternative involves: <br /> <br />1. Removal and replacement of the existing outlet pipe and gate tower. <br />2. Construction of a new service spillway, incorporated into the gate tower. <br />3. Construction of an emergency spillway, located west of the outlet. <br />4. Leveling of the crest of the entire dam. <br />5. Placement of riprap along the upstream face of the dam in all areas of <br />construction. <br /> <br />The implementation schedule calls for completion of financing arrangements in summer 2003. <br />Construction will begin in September 2003 and will be completed by December 2003. <br /> <br />Financial Analysis <br />The total estimated cost of the project is $388,095. Staff is recommending that the CWCB <br />Board approve a Small Project Loan of $350,000 (approximately 90% of the estimated total <br />project cost.) <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.