My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150160 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150160 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:09:45 AM
Creation date
3/26/2007 10:15:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150160
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Adams
Morgan
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 3 <br />Groundwater Recharge Projects <br />Groundwater Management Subdistrict of the <br />Central Colorado Water Conservancy District <br />2003 <br /> <br />Proiect <br /> <br />Case Number <br /> <br />Date Decreed <br /> <br />Location <br /> <br />Milliron & Kiowa <br />Box Elder Creek <br />Farmer's Independent Ditch <br />Western Mutual Ditch <br />Lupton Bottom Ditch <br />Platteville Milling Ditch <br /> <br />81-CW -832 <br />82-CW -413 <br />85-CW-370 <br />87-CW-304 <br />94-CW -199 <br />o l-CW -048 <br /> <br />1987 <br />1982 <br />1985 <br />1987 <br />1994 <br />2001 <br /> <br />Wiggins <br />Hudson <br />Platteville <br />Platteville <br />Fort Lupton <br />Fort Lupton <br /> <br />In 1997, the Subdistrict entered into an agreement with Hall-Irwin Construction Company of <br />Greeley to install a bentonite slurry wall liner around a gravel pit located northwest of Brighton. <br />When completed, the project will hold approximately 3,000 acre-feet of water for augmentation <br />purposes. In 1999, Koenig Reservoir was completed northwest of Fort Lupton. It is also a <br />bentonite slurry lined reservoir created from a mined gravel pit. It's capacity, when completed, <br />will be approximately 1,100 acre-feet. In 2001, a third lined gravel pit was completed on the <br />west side of Greeley along the Cache la Poudre River. It will store approximately 300 acre-feet <br />when finished. In 2003, the Bernhardt Pit was lined east of Milliken, and the Nissan Pit will be <br />lined in 2004. <br /> <br />Table 4 <br />Gravel Pit Storage <br />Groundwater Management Subdistrict of the <br />Central Colorado Water Conservancy District <br />2003 <br /> <br />Proiect <br /> <br />Storage Amount <br /> <br />Location <br /> <br />Walker Reservoir <br />Koenig Reservoir <br /> <br />1,600 acre-feet <br />1,100 acre-feet <br /> <br />Brighton <br />Fort Lupton <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.