My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150160 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150160 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 11:09:44 AM
Creation date
3/26/2007 10:15:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150160
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Adams
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />complete the work and pay any cost in excess of the net proceeds. In the event <br />BORROWER chooses to repay the loan, BORROWER shall remain responsible for the full <br />loan amount outstanding regardless of the amount of such insurance proceeds or <br />condemnation award. <br /> <br />9. Captions. The captions and headings contained in this contract are for convenience <br />and reference only and shall not be construed so as to define or limit the terms or <br />provisions contracted herein. <br /> <br />10. CWCS's Approval. This contract requires review and approval of plans, specifications, <br />and various other technical and legal documents. The CWCS's review of these <br />documents is only for the purpose of verifying BORROWER'S compliance with this <br />contract and shall not be construed or interpreted as a technical review or approval of . <br />the actual design or construction of the PROJECT. Notwithstanding any. consents or <br />approvals given to the BORROWER by the CWCB on any such documents, BORROWER <br />and any of its consultants, by preparing any such documents, shall be solely <br />responsible for the accuracy and completeness of any of said documents. <br /> <br />11. Waiver. The waiver of any breach of a term of this contract shall not be construed as a <br />waiver of any other term or of any subsequent breach of the same term. <br /> <br />12. Addresses for mailing. All notices, correspondence, or other documents required by <br />this contract shall be delivered or mailed to the addresses shown in the Project <br />Summary, Section 1 for the BORROWER and to the address below for the CWCB: <br /> <br />Colorado Water Conservation Board <br />Attn: Construction Fund Section <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />SPECIAL PROVISIONS (4/1/04 version). State Fiscal Rule 3-1 requires the inclusion of these <br />Special Provisions in every STATE contract, including grants. <br /> <br />1. CONTROLLER'S APPROVAL. CRS 24-30-202 (1) <br /> <br />This contract shall not be deemed valid until it has been approved by the Controller of <br />the State of Colorado or such assistant as he may designate. <br /> <br />2. FUND AVAILABILITY. CRS 24-30-202 (5.5) <br /> <br />Financial obligations of the State of Colorado payable after the current fiscal year are <br />contingent upon funds for that purpose being appropriated, budgeted, and othelWise <br />made available. <br /> <br />3. INDEMNIFICATION. <br /> <br />To the extent authorized by law, the BORROWER shall indemnify, save, and hold harmless <br />the State against any and all claims, damages, liability and court awards including costs, <br />expenses, and attorney fees incurred as a result of any act or omission by the <br />BORROWER, or its employees, agents, subcontractors, or assignees pursuant to the terms <br />of this contract, or as a result of the CWCS's interest in the PROJECT facilities and any <br /> <br />Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.