Laserfiche WebLink
<br />Central Colorado Water Conservancy District <br />November 21, 2003 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desian and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. <br /> <br />Sincerely, <br /> <br />~aJ~ <br /> <br />Mik;"~: PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: CCWCD 1103 memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: Projects\Proj-New\CCWCD 1103 Ltr <br />