Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />Additionally. with the acquisition of these shares. we intend to loin one of the existing <br />augmentation grOUpS to reduce the expenses associated with implementing our permanent supplY <br />plan. <br />Water Right: <br /> <br />CFS. <br /> <br />Ayerage water diverted per year: 120 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES_NO (Only ones listed above) <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Michael D. Shimmin Vranesh & Raisch.. LLP Attorneys at Law <br />1720 14th S1.. Suite 200 <br />PO Box 871 <br />Boulder. CO 80306-0871 <br />Phone: (303) 443-6151 Fax: (303) 443-9586 <br />Nation Engineering Services. LLC <br /> <br />Brent Nation <br /> <br />231 Main Street. Suite 306 <br />PO Box 314 <br />Fort Morgan. CO 80701 <br />Phone: (970) 867-2883 Fax: (970) 768-2352 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are. now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Brent Nation is in progress on the feasibility study for this prolect. Estimated <br />completion date is the 15th of April. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br /> <br />$ 5.000.00 <br /> <br />$ 330.000.00 <br />~ ';'10) DtJO <br /> <br />~,~. (p('6f 0'+ <br /> <br />~ <br /> <br />r-1:.'T A(\{)"? <br />