My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000244
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2010 10:34:23 AM
Creation date
3/26/2007 10:12:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150177
Contractor Name
Smart Brothers, Inc.
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Collateral <br /> <br />1. SB1 can offer as collateral all of the project features. <br /> <br />2. SBI can offer as collateral a 160 acre pivot irrigated farm <br />located in the SE1/4 of Section 16, T6N, R53W. <br /> <br />Institutional Considerations <br /> <br />SB1 need authorization to borrow $239,850 from the CWCB <br />Construction Fund. The loan, if approved, from the CWCB will be <br />contingent upon the successful negotiation of a contract between <br />the CWCB and SB1. Agreements with contractors will be finalized <br />upon authorization of the CWCB loan. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks which would keep SB1 from <br />successfully completing this project. <br /> <br />Feasibility Study <br />Smart Bros. Aug Project <br />June 2004 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.