Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The Selected Project <br /> <br />SBI plans to construct alternative #3. Features of this <br />alternative are as follows: <br /> <br />Drill one new well to pump water into recharge ponds. The <br />well would pump up to a maximum rate of 7 cfs. This would <br />produce up to 1000 acre feet annually from the well. The <br />well would both be located within 100 feet of the South <br />Platte River. <br /> <br />Three new recharge ponds will be constructed at locations to <br />be filled by the recharge well. <br /> <br />Piping will be used to convey water from the well to the <br />existing and proposed recharge ponds. Piping will be 18 <br />inches in diameter. The piping will be buried. <br /> <br />Four existing wells will be tied into the pipeline to be <br />used as augmentation wells. <br /> <br />See the map in Appendix B for project features locations. <br /> <br />Water Rights <br /> <br />SBI currently have decrees on the 12 wells used for their <br />operations. These wells are augmented through LWU. SBI also own <br />shares of the following water rights: <br />South Platte Ditch Company <br />Davis Brothers Ditch Company <br />Prewitt Reservoir - Logan District <br /> <br />The proposed recharge well is already being list in the LWU plan <br />for augmentation. <br /> <br />Feasibility Study <br />Smart Bros. Aug Project <br />June 2004 <br /> <br />5 <br />