My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACWWA 2007 WCPlan
CWCB
>
Water Conservation
>
Backfile
>
ACWWA 2007 WCPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 11:55:30 AM
Creation date
3/23/2007 2:19:50 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Applicant
Arber Water, WasteWater & Reuse Engineers
Title
Arapahoe County Water and Wastewater Authority Water Conservation Plan
Date
11/1/2006
County
Arapahoe
Water Conservation - Doc Type
Complete Plan
Document Relationships
ACWWA 2007 WCPlan Approval Letter
(Message)
Path:
\Water Conservation\Backfile
ACWWA_WEPlanUpdate2016
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ARAPAHOE COUNTY WATER AND WASTEWATER AUTHORITY <br /> <br />additional reductions in average day water demand by further modifying rate structures (i.e. <br />Irvine Ranch Model). <br /> <br />Water Conservation Plan Implementation <br /> <br />The implementation of the measures and programs will be spread throughout the 10 year <br />planning period of this Water Conservation Plan. Measures and programs will be phased in order <br />to spread out the capital costs and increased administrative efforts required for the projects. <br /> <br />The measures and programs outlined in this plan will be monitored for their water savings and <br />associated costs. This data will be collected annually so that the programs effectiveness can be <br />tracl(ed. <br /> <br />The Authority intends to update the plan, at a minimum, every 7 years and will update the plan <br />when significant changes occur to the system. When updating the plan the Authority will <br />examine the costs and benefits of the measures and programs that were implemented in the <br />previous plan. The Authority will also have the opportunity to add additional water saving <br />measures and programs. <br /> <br />Monitor, Evaluate and Revise Conservation Activities <br /> <br />Implementation of the Water Conservation Plan is a long term activity that involves continual <br />evaluation and refinement of the plan. The Water Conservation Plan will begin to be <br />implemented following adoption by the ACWW A Board, and will be implemented in general <br />conformance with the l(ey activities identified in this report. <br /> <br />Richard P. Arber Associates, Inc. <br /> <br />ES-4 <br /> <br />ACWW A05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.