My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00056 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00056 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:03 AM
Creation date
3/20/2007 11:17:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150041
Contractor Name
Woodchuck Ditch Company
Contract Type
Loan
Water District
58
County
Routt
Bill Number
SPL
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />STATE OF COLORAl3b <br /> <br />,/ <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone, (303) 866-3441 <br />FAX, (303) 866-4474 <br /> <br />~ <br /> <br />Bill Owens <br />Governor <br /> <br />March 24, 2000 <br /> <br />Greg E.Walchcr <br />Executive Director <br /> <br />Peter H. Evans <br />eWeB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Mr. Joe Zimmerman, President <br />Woodchuck Ditch Company <br />42095 RCR 44 <br />Steamboat Springs; CO 80487 <br /> <br />RE: Reconstruction of Ditch Section <br />Small Project Loan Approval <br /> <br />Dear Mr, Zimmerman, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your Small Project Loan request. We understand the loan will be used to <br />reconstruct a 400-foot section of the Company's ditch. <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum <br />amount of $40,000 with terms of 3.75% for 20 years, I have attached a copy of the <br />updated Board memo concerning the Woodchuck Ditch Company. Please refer to page 4 <br />of that memo and to the section "Action taken by the CWCB March 20, 2000," <br /> <br />When the Board approves a Small Project Loan there remain several conditions: <br /> <br />a) A Feasibility Study must be completed. Thank you for providing a draft of the study, <br />John Van Sciver will complete the study with input from you, John Fetcher, and the <br />NRCS, The CWCB has required that the study be finalized by April 30, 2000 in <br />accordance with the Construction Fund Guidelines, No loan funds can be released <br />until the study is complete. <br /> <br />b) An approved contract must be in place before funds can be advanced. Jan IlIian has <br />contacted you concerning our contracting procedure. It usually takes about 2 months <br />to complete the contract once the Board has approved the loan. <br /> <br />c) You must adhere to the CWCB Des/on and Construction Administration Procedures. <br />Tim Feehan will contacted you regarding the CWCB requirements concerning project <br />design and construction. Tim will make construction inspections, which will be the <br />basis of the monthly pay estimates for disbursement of your loan funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.