My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150033 Application
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150033 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
3/9/2007 11:23:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150033
Contractor Name
North Fork River Improvement Association
Contract Type
Grant
Water District
0
County
Delta
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />':;' <br /> <br />CWCB Construction Fund Loan Application <br /> <br />Fonn Revised Man:b 4, 1998 <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing opemtional or maintenance problems. (Attach separate sheets and a map, if <br />needed. ): <br />The highly unstable banks of the North Fork of the Gunnison make it vel)' difficult to <br />maintain irriJZation diversions and the annual "push-up" l?:favel darns tend to exacerbate the <br />problem and perpetuate the cycle of destabilization. <br /> <br />6. <br /> <br />For existing facilities indicate: <br />(a) Number of shareholders _, or <br />(c) Current Assessment per share $_ <br />(e) Number of acres irrigated 20.000 acres <br /> <br />(b) Number of customers served_ <br />(d) Number of shares <br /> <br />Part B. - Description of the Project <br /> <br />1. Name of the project or facility: North Fork River Improvement Proiect <br /> <br />2. What is the purpose of this loan application? Check one. <br />_ New project <br />_ Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />X Other (describe) Rehabilitation of numerous diversion facilities <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO NI A <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.