My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01817
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
3/9/2007 11:23:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0053FX
Contractor Name
Nunn, Town of
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES ~ NO_ <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form.) <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and <br /> <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br /> <br />a map, if needed.): <br />Have 2 adjudicated wells, both high in nitrates, infiltration gallery <br /> <br />not producinq at anticipated level. and decreasing. every year <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders , or <br />(b) the number of customers served 141 <br /> <br />Part B. - Description of the Project <br /> <br />See Attached Preliminary Engineering Report <br /> <br />I. Name of the project or facility: <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />_ New project <br />_ Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NO <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.