My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01816
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
3/9/2007 11:23:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0054FX
Contractor Name
Pagosa Springs Pipeline Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. \ ": <br /> <br />I <br />'. <br /> <br />.. <br /> <br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />\ <br /> <br />. <br />,. <br />, <br /> <br />4. <br /> <br />Is the organization incorporated in the State of Colorado? YES --X- NO _ <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form.) <br /> <br />By-laws will be provided upon <br />formal adoppion <br /> <br />5. <br /> <br />Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map, if needed.): <br />Each member has individual facilities, this Vlould link <br />them together (please see attached sheet) <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders 5 <br />(b) the number of customers served <br /> <br />or <br /> <br />Part B. - Description of the Project <br /> <br />1. <br /> <br />Pipeline Construction <br /> <br />Name of the project or facility: <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />X2New project <br />_ lRehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. . If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NO .lL <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.