Laserfiche WebLink
<br />~ <br /> <br />.-' .~ <br /> <br />Pagosa Springs Pipeline Co. <br />Mr. Jay Harrington <br />November 21, 1995 <br /> <br />2 <br /> <br />has received fInal approval in January 1996. You should call Jan as soon as possible after <br />the January meeting to discuss the contracting procedure, and to initiate the contract. It <br />usually takes about 3 to 6 months to complete contracting. No CWCB funds can be <br />disbursed until the loan contact is signed by all parties. <br /> <br />d. You must adhere to the CWCB Design and Construction Administration Procedures. <br />Please contact Mike Serlet of this offIce (303-866-3441) before you start design, or bid <br />construction of the project. Mike will explain our contractor bidding and bonding <br />requirements, and will make fIeld inspections during construction. His inspections will <br />be the basis of monthly pay estimates for disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. John Van Sciver will continue to work closely <br />with you through the Feasibility and fInal approval process for your loan. Please call him at any <br />time if you need assistance. <br /> <br />Sincerely, <br /> <br />W~F:~ <br /> <br />William P. Stanton, P .E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />NS:jvs <br /> <br />Attachments: <br /> <br />1. Updated Memo 18e.nov <br />2. CWCB Guidelines for Financial Assistance <br />3. Sample Feasibility Study (and Disk). <br /> <br />cc (wI Attachment I.): <br />Ms. Janice C. Sheftel, Member CWCB <br /> <br />cc (w/o AttachmenlS): <br />101m Van Sciver, CWCB Staff <br />Bill Green, CWCB Staff <br />Mike Serle!, CWCB Staff <br />Jan lIIian. CWCB Staff <br /> <br />C:\ WP51 'JOHN\ 18eNOV96.11r <br />