Laserfiche WebLink
<br />Mr. Darrin Manuello, Vice President <br />Peoples Ditch Company <br />September 29, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCS Desiqn and Construction Administration Procedures. <br />Tim Feehan will contacted you regarding the CWCS requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will <br />be the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />Guidelines is attached. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />1. Updated Memo: PeoplesDitch700memo <br />2. Construction Fund Guidelines <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />Lynn R. Lovell P.E., NRCS, Sterling Field Office, 1607 Pheasant Ridge, Sterling, CO 80751-4721 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: wp51 \Proj-New\PeoplesDitch900Itr <br />