My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01812
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
3/9/2007 11:23:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0054FX
Contractor Name
Pagosa Springs Pipeline Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />pagosa springs Pipeline Company <br />DRAFT FEASIBILITY STUDY <br />CWCB...January 8, 1996 <br /> <br />A. statement of Need for the project: <br /> <br />1. The pagosa Springs Pipeline Company is undertaking this <br />project to maximize the use of the Town's Geothermal resource. <br />The funds would be utilized to build a pipeline to transport <br />raw geothermal water after it is utilized in the Town's <br />Heating Utility to commercial users on the south side of the <br />San Juan River. <br /> <br />2. The Town of pagosa Springs is involved because of the on- <br />going ligation surrounding the Town's use and plans to expand <br />its use of geothermal water. The pipeline will solve many of <br />the issues associated with the ligation. <br /> <br />3. The project is needed because geothermal water is used <br />extensively for heating and commercial spa facilities and many <br />more claims on water exist than actual water. The pipeline <br />would be the first step in developing an efficient use of the <br />community's geothermal resource. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.