My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01812
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
3/9/2007 11:23:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0054FX
Contractor Name
Pagosa Springs Pipeline Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />pagosa Springs Pipeline Company <br />DRAFT FEASIBILITY STUDY <br />CWCB...January 8, 1996 <br /> <br />G. Institutional Considerations: <br /> <br />The Town is under contract to provide lease geothermal water <br />to the south side of the river. This is a portion of the <br />water that will be accessed by the new pipeline. <br /> <br />Ii/mAL <br />The Town ha~~approval from the CWCB to borrow $60,000 SL ~art <br />of a 1~lD Legi~lC1L.i:-vc: AuthuLi.~atiOl'l (lIB 1102 PfJ 1400 1402 <br />Session LaUD of Colorade 1383 Vol. ~t. The loan from the CWCB <br />is contingent upon the successful negotiation of a contract <br />between the CWCB and the Town. <br /> <br />The Company is a non-profit company which qualifies for the <br />loan. <br /> <br /><!:- <br />UI.I4r <br />tt, <br />S!y;UfJi;w'l <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.