Laserfiche WebLink
<br />. . <br /> <br />I <br />'. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORI\DO <br /> <br />. <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Covernol <br /> <br />(Updated February 6, 1998) <br /> <br />J"mes S. Lochhe"d <br />Executive Director. DNR <br /> <br />D"ries C. lile. P.E. <br />Director. CWCB <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: John Van Sciver <br /> <br />DATE: January 16, 1998 <br /> <br />SUBJECT: Agenda Item 8a. January 28-29, 1998, Board Meeting-- <br />Riverside Reservoir and Land Company <br /> <br />Approval of a Construction Fund Authorization in amount of $450,000 for <br />construction of an emergency spillway on Riverside Reservoir, and for the <br />purchase of land, and approval of a $2,500 grant from the Small Dam Site <br />Reconnaissance Fund to complete the Feasibility Study. (This item has been <br />carried over from the November 24, 1997 Board meeting, item 17n.) <br /> <br />BACKGROUND <br /> <br />This item was considered at the November 24, 1997 Board Meeting, and deferred to the January <br />28, 1998 meeting to allow time to draft the feasibility study.) <br /> <br />The Riverside Reservoir and Land Company (RRLC), located in Weld County, has applied for a <br />Construction Fund Authorization to construct an emergency spillway on Riverside Reservoir, and <br />to purchase the BLM land that lies within the reservoir basin, and immediately adjacent to the <br />reservoir. The Company is requesting a $450,000 Authorization from the Construction FUIl;d for <br />the spillway and land purchase, approximately 85% of the estimated total cost of $530,000. The <br />Riverside Reservoir is located about 25 miles west of Fort Morgan (see attached map.) The <br />reservoir has a capacity of 63,400 acre feet. The State Engineer's Office has imposed a nominal <br />restriction of 0.05 feet (storage loss of 200 acre feet) due the lack of an emergency spillway. <br /> <br />W. W. Wheeler and Associates PE, has completed reconnaissance level engineering design <br />work, and a draft of the feasibility study. The estimated total cost of the study will be $5000. <br />Portions of the feasibility study are attached. <br />