My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01805
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:29 AM
Creation date
3/9/2007 11:23:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0047FX
Contractor Name
Colorado Trout Group Inc.
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. CWCB Construction Fund Loan Application <br /> <br />Please provide a brief narrative- description of the proposed project including purpose-~ need., <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed <br />Mandlester Lake, W. Div. DAMIB # 06W07 is UDder die jurisdidieR of tile State Engineer in <br />accordance with Section 37-87-107~ Colorado Revised Statutes (1991 RepL Vol 1). Based on an <br />inspection in 1994. and subsequeat sites visits by the State EagiaeeF~ a series of rehabilitative <br />measures have been mandated to bring the Dam up to current safety standards. These <br />measures include: 1) Grouting the emting draw-down structure that was no longer operable <br />and was leaking.. 2) Construdion of a new emergency dl'aw...oowu structure 3) AdditioD of a <br />sand filter" and fiB to tile dowBstream face of the M.andiester Lake Dam. A snmlD9ry of the <br />.inspecticm 1IismFy, and specific RfeRHCe to ~ ami t'UIIIIIIeIIts from tile State <br />ED~r is docwnented ia Attachment D. From 1998 to 2000 tile first requirement (grouting <br />the old outlet pipe) was amlpleted (see Attadtment E whidt OOcUIDeBts mmpletioB of the <br />grouting of the old draw-down pipe S""mce that time Colorado Trout group has approached <br />several avenues to fund the remainder of the required construction and has been unsuccessful <br />in obtaining funds.- We have completed a cofrer-dam to. allow eoDStrudien of the Dew draw- <br />down structure, but are uabIe to proeeed due t& fiRAJN"till eoustraiDts.. We are presently faced <br />with serious remedial actions if the repairs are not completed, but do Dot have the financial <br />resources to accomplish. the costly constructiolL. A 404 permit eyemption has been. obtained <br />from tile US Army Corps 9f EngiReers tD amstruct a JivestDCk watering pond on one of the <br />lower pastures which will provide t.be needed fiB material at tbe lowest possible expense. In <br />addition,. plans have been completed for the draw-down stru~ as weD as the neces.ury dam <br />repair.. These plans can be made available UPOD request.. <br /> <br />Water" Right: _ Appt-oddatdy 2 ~ 200- acre feet storage. <br /> <br />Average water diverted per year: _50 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES _ NO XXX <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.