Laserfiche WebLink
<br />06/25/00 <br /> <br />Dam Grouting cost <br />does not include monies previously paid to Pete Aberle <br /> <br />material eTG paid material Law paid total material <br /> <br />aberte bill <br /> <br />grand total <br /> <br />$1,840.49 <br /> <br />$5.00 <br /> <br />$1,845.49 <br /> <br />$1,772.32 <br /> <br />$3,61781 <br /> <br />each side needs topay $1808,91 <br /> <br />if Anne pays all of Aberles current bill then she wiil be $3659 short which we would like to deduct <br />for the 5250.00 lake rent due her on 6/30100 <br />