My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01805
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:29 AM
Creation date
3/9/2007 11:23:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0047FX
Contractor Name
Colorado Trout Group Inc.
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The engineer plans to re-establish an operational outlet on the left: abutment of the north dike, <br />either a concrete. lined slot channel or a concrete conduit, with a low-head slide gate. The invert of this <br />al'TUlgcment would be placed such that the top 5 feet of the nonnal storage in the reservoir could be <br />drained off through it. Tim believes that bedrock is close to the ground surface in that area. We <br />discussed the desirability of hllVing the capacity to lower the reservoir by 5 feet in S days, if possible. The <br />owner is confident that the hydraulic connection between the main reservoir area and the portion which <br />wraps around to contact the north dike is low enough to allow withdrawal of the top S feet through that <br />ann of tile reservoir. <br /> <br />Seepage along the lower stope and toe of the main dam would be addressed by the placement ~f <br />an aggregate filter and drain system, with a perfOf'lltcd collection pipe. A two--stage aggregate filteT/d~m <br />system is proposed. without geotextiles which might tend to clog under the p~sence of obs~rved Iron <br />bacteria in the area. We indicated the need for a non-perforated outfall pipe and a devtce at the <br />downstream end for measuring seepage. Also, it is the intent of the design to include the downstream end <br />of the grouted outlet pipe within the toe filter/drain, to ensure that any seepage from or around the old <br />outler is filtered and picked up by the drain. <br /> <br />Stability of the downstream slope of the main dam WOU~ be enhanced by the pa.cement of a <br />granular filter material on the stripped downstream slope of the dam, followed by suitable embankment <br />materaals used to flatten the slope to an acceptable angle. Tom McDaniel has proposed the rather <br />controversial concept of wintertime stripping of the downstream toe area in leapfrogging panels after the <br />organic materials in place at the toe have frozen. This would, presumably, pennit dealing with the soft, <br />wet materials when they are easier to work with. The problem then becomes placement of suitable fill <br />materials back in the excavation under cold. wet weather conditions, which would be very difficult, al <br />best, to say nothing of the possibilities of finding a contractor who would be willing to work under such <br />conditions. The problems with this approach were discussed in detail. <br /> <br />The proposed work at the north dike would be to merely add to its downstream face to achieve a <br />suitable embankment. 1 ind~atcd that seepage conditions are bad along the toe of this dike, as well, and <br />that lhe excessive aspen growth on all 5urfaces of this small dike would have to be removed. RemoYing <br />tree stumps and chasing roots might require such eXlensive excavation that it would be more economical <br />to simply remove this dike and rebuild it. which would also allow suitable foundation preparation to be <br />pcrfonned. This would, of course, require lowering of the rcsel'\'oir to below the foundation surface for <br />the dike, which could be a problem. <br /> <br />The question ofspillwa)' adequacy W3S also brought up. I informed them of the possibility of the <br />uparading of the dam to a Class 2 structure, based on the downstream hazards I noted in 1995. That <br />would require a greater flood routing capacity tban now exists, and it would probably make sense [0 <br />incorporate a larger emergency spillway with adequate freeboard (minimum of 3 feet) into lhe current <br />design and construction wort, as it could be included at minimal cost. The enlarged spillway would still <br />be on the left abutment of the north dike, probabfy contained within the area used for construction of the <br />new outlet. The owner controls all of the land downstream of the dam for about ~ mile so location of the <br />sp~Hway i~ not a. flood easement issue. The watershed for the reservoir is small, so'development of 8 <br />~plf,lway sIze Whl~h would allow routing of the Y2 PMP flood should not be overly difficult. It was <br />m~'cated that the mven of the emergency spillway channel should provide the minimum freeboard [0 all <br />points on the dam and dike crests; this would require raising the existing dike crest somewhat. Jr is <br />intended by the owner that the existing pipe service spillways at each end of the main dam be retained <br />(although the spillway channel for the left pipe would be rerouted away nom the dam toe), so the <br />emergency spillway could be designed as an earth section with a simple grade cantrall crest structure to <br />prevent backcutting to the resel'Voir during its design flood discharge. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.