Laserfiche WebLink
<br />. <br /> <br />Agenda Item 20d <br />March 9, 1994 <br /> <br />3 <br /> <br />2. Allowed that this Feasibility Study loan may be rolled into the Construction Loan <br />for the project and repaid at the same terms established for that loan, or forgiven <br />altogether if it is determined that the project is not feasible, and <br /> <br />3. Required that the loan be contingent upon review of the Company's financial <br />condition and ability to pay, and upon all standard contracting provisions of the <br />CWCB. <br /> <br />(Note: On 3/9/94 I left a message for Trent Taylor, saying the CWCB had approved this loan). <br /> <br />Attachments <br />C:\wp51\20d.mar <br />