Laserfiche WebLink
<br />RED MESA RESERVOIR ENLARGEMENT <br />FEASmILITY STUDY <br /> <br />TABLE OF CONTENTS <br /> <br />CHAPTER <br /> <br />Summary of Findings <br /> <br />1. 0 Introduction <br /> <br />2.0 Study Objective <br /> <br />3.0 Red Mesa Ward Reservoir and Ditch Company <br /> <br />4.0 Previous Studies <br /> <br />5.0 Study Area Description <br /> <br />6.0 Water Demands <br /> <br />7.0 Project Lands <br /> <br />8.0 Hydrology and Water Rights <br /> <br />9.0 Water Quality <br /> <br />10.0 Field Investigations <br /> <br />11.0 Evaluation of Alternatives <br />11.1 Repair Alternative <br />11.2 Enlargement Alternative <br /> <br />12.0 Description of Selected Plan <br />12.1 Inlet Ditch <br />12.2 Outlet Works <br />12.3 Spillway <br />12.4 Embankment <br />12.5 Land and Rights <br />12.6 Permitting <br />12.7 Project Costs <br />12.8 Implementation Schedule <br />12.9 Financing Plan <br />12.10 Wetlands <br />12.11 River Basin Depletion <br /> <br />~ <br />I< ." <br /> <br />RECEIVED <br />FEB 0 3 1995 <br /> <br />Colorado Water <br />Conservation Board <br /> <br />PAGE <br />1 <br /> <br />2 <br /> <br />2 <br /> <br />3 <br /> <br />6 <br /> <br />7 <br /> <br />9 <br /> <br />11 <br /> <br />11 <br /> <br />17 <br /> <br />17 <br /> <br />18 <br /> <br />19 <br />20 <br />21 <br />22 <br />23 <br />25 <br />25 <br />25 <br />26 <br />27 <br />28 <br />29 <br />