My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01770
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
3/8/2007 1:45:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0057FX
Contractor Name
Red Mesa Ward Reservoir and Ditch Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r.... <br /> <br />~ <br />, <br /> <br />~5 <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone (303) 866-3441 <br />FAJ{ (303)866~74 <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />May 6, 1994 <br /> <br />Daries C. Lile, P.E. <br />Director, CWCB <br /> <br />The Red Mesa Ward <br />Reservoir and Ditch Company <br />Attn: Mr. Trent Taylor <br />1290 County Road 102 <br />Hesperus, CO 81326 <br /> <br />Dear Trent: <br /> <br />Enclosed are four copies of the proposed contract between your company and this board for the <br />purpose of financing the cost of a Feasibility Study for the repair and rehabilitation of the Red <br />Mesa Ward Dam. ' ------------ <br /> <br />I recommend that yd have your attorney review the contract and attachments for accuracy and <br />acceptability to your company. <br /> <br />Three contract attachments are required: <br /> <br />~ Appendix A; Proposal for the project feasibility report, prepared by Harris Water <br />Engineering, Inc. I will attach a copy of this proposal to the signed contracts you ret~ <br />to us. <br /> <br />~ Appendix B; Resolution of the Stockholders. I have attached a suggested draft for <br />you to consider; or you may use your own form. Four original copies of the executed <br />resolution form must be returned with the four signed contracts. <br /> <br />~ Appendix C; Deed of Trust. Please have your attorney prepare this document, using <br />the Bradford Publishing Company standard form #34lA provided. Check the legal <br />description (paragraph 7a. of the contract) for accuracy, and then use it in the Deed of <br />Trust. Of course, you must first have the church deed this property to your company. <br />The executed Deed of Trust must be returned with the four signed contracts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.