My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01764
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
3/8/2007 1:45:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0039X
Contractor Name
Goodhue Ditch and Reservoir Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-, <br /> <br />. Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />December 9, 1994 <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Danes C. Lile, P.E. <br />Director, CWCB <br /> <br />Mr. John D. Mayhoffer <br />President . <br />Goodhue Ditch and Reservoir Co. <br />P.O. Box 276 <br />Louisville, CO 80027 <br /> <br />RE: Replacement of the Marshall Flume <br />Initial Loan Approval <br /> <br />Dear Mr. Mayhoffer, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />that the Colorado Water Conservation Board (CWCB) has granted initial approval of your request <br />in the amount of $19,000 for the construction proj ect. It is our understanding that these funds <br />will be used to replace the Marshall flume which is owned by your company. <br /> <br />The CWCB also approved a loan term of 30 years at an interest rate of 4.7%. I have attached <br />a copy of the updated Board memo concerning the Goodhue Ditch and Reservoir Company. <br />Please refer to page 2 of that memo and to the section "Action Taken by the CWCB, November <br />4,1994". Your Construction loan will be considered by the State General Assembly as part of <br />the 1995 Construction Fund Bill, with passage expected in May 1995. Funds will be available <br />about July 1, 1995, provided we can negotiate a contract by that date. <br /> <br />The Board has given their initial approval subject to several conditions: <br /> <br />a. An engineering cost estimate is required. The cost estimate must be accompanied by a <br />written project description and a set of the plans and specifications upon which it is based. <br />Bill Green of this office (866-3441) can provide assistance and guidance, and will <br />ultimately be reviewing the cost estimate and written discussion of alternatives. <br /> <br />b. An approved contract must be in place before the construction work can proceed. Ms. <br />Jan Illian of this office will draft the contract in March or April of 1995, and will send <br />you a review copy upon request. Final contract documents will be sent to you for signing <br />after the Construction Fund bill is signed by the Governor, about June 1, 1995. Please <br />contact Jan (866-3441) after February 1, 1995 to initiate the contracting procedure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.