Laserfiche WebLink
<br />'" <br /> <br />CWCB Construction Fund Loan Application <br /> <br />stTIlctllre and me::lsurine weirs through approximately .s mile descrihed in p::lrts of section 1, <br />T10n R7e and sections .s,o,R T10n RRe NMPM An ::ltt::lched NRCS T ,::IT::lTll, Colo field office <br />Pl::ln Map is included <br /> <br />Water Right: l.4....4 <br /> <br />CFS. <br /> <br />Average water diverted per year: _6026_ acre- feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES _ NO X <br />If YES, please explain. <br /> <br />7. Please list the names and addresses ofthe Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS ::lnd PHONE <br /> <br />Pete Gallegos <br /> <br />NRCS Office, PO Rox 2.1.s, T.::l Tar::l, CO Rl140 <br /> <br />(719)-274-.sRoR Ext 1 F::lX 719-274-411? <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Attached Feasibility Study <br /> <br />9. Estimated cost of the project. Please include estimated engmeenng costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: $14,400 In-Kind <br /> <br />Estimated Construction Costs: $210,225 <br /> <br />Estimated Total Costs: $225,058 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $R400400 (Usually 75% of Estimated Total Costs) <br />Term (length) of loan: 10 ye::lrs (Usually 10,20, or 30 years) <br /> <br />Interest Rate: ? 'i% (Please call for our current rates) <br /> <br />1 <br /> <br />CFLA902 <br />