<br />-, <br /> <br />Table 1. EI Viejo Ditch Company - Pipeline Project - Cost Estimate <br /> <br /> Item Quantity Unit Unit Price $ Amount $ <br />Mobilization 1 Job 0 $0 <br />Rioht of Way Easement 1 No.. $25,000 $25,000 <br />2 Inlet structures, concrete 12 C.Y. $500 $6000 <br />3 Turnout structures concrete 6 C.Y. $500 $3000 <br />Measuring Weirs 10 each &750 $7500 <br />16,930 Lt. Plastic lrrioation Pipeline 279,930 Dl-LF $0.60 $167,958 <br />40 ft.Culvert Pipe 1200 Dl-LF 1.00 $1200 <br /> Total $210,658 <br /> <br />Implementation Schedule <br /> <br />The NRCS has completed the 75% design surveys. <br />Designs will be completed by 10-2003 by NRCS <br />Construction can begin at any time and completed by fall of 2004. <br /> <br />Permitting <br /> <br />All easements and rights of way have been arranged for. The project will not involve any <br />Army Corp of Engineering 404 permitting. <br /> <br />I nstitutional Considerations <br /> <br />Entities that are, or may be, involved in the design, construction, and financing of the <br />project include: <br /> <br />1) El Viejo Ditch; financing and project management. <br />2) Natural Resources Conservation Service (NRCS); financing, surveys, designs, and <br />construction inspection. <br />3) Colorado Water Conservation Board (CWCB); financing <br /> <br />The EI Viejo Ditch members Jim Braiden (agent), Paul Faucette and Alan Miller will be <br />the lead for the financing, design, and construction of the project and will be the entity <br />entering into contracts and agreements with the various entities for the services <br />provided by each. <br /> <br />Financial Analysis <br /> <br />Several entities will be involved in financing the estimated total project cost. The EI <br />Viejo Ditch is applying for a loan from the CWCB in the amount of $77,154 to <br />accommodate the 63% Company cost share. The actual or estimated amounts by entity <br />are given in Table 2. <br />