Laserfiche WebLink
<br /> <br />2. Five irrigation structures with divider, <br />measuring, check and turnout abilities will <br />be installed at strategic sites to control <br />and measure water flows into and from the <br />two side by side pipelines. One pipe will <br />be gravity converted to pressure with <br />accumulating distance. The other pipeline <br />will be design as partial pipe gravity flow <br />no pressure pipeline. <br />3. The Hazard Classification for this project <br />is LOW. The practices are located in a <br />rural setting surrounded by rangeland and <br />pastureland. Failure of these practices <br />would result in no loss of life and some <br />minor damage to either rangeland or <br />pastureland. <br />4. ~lie basis for engineering joo <br />flassification is the design ~low of-thE; <br />partial flow mainline of 4715 gallons pe~ <br />minute and the gravity pipeline 1880~~ <br />~ax. Design working pressures of the <br />bipeline should be below 40 pounds p~ <br />square inch (psi) through the gravity~. <br />bipeline and 0 psi on the partial pipe fl~ <br />~ine. Static pressures can be as hig~ <br />~5 psi on_the lowe~_end of ~e_gravity, <br />pj. pe line ., <br /> <br />C. Client/Sponsor Information <br /> <br />1. The names of the clients are Braiden Cattle <br />Co. c/o W.J. Braiden, Paul Faucette, Alan <br />Miller, and Erastio Velasquez, all <br />individual farmers in Conejos County. <br /> <br />2 <br /> <br />