My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01762
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01762
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
3/8/2007 1:45:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0040X
Contractor Name
El Viejo Ditch
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Appendix B <br /> <br />USDA NRCS <br />Economic Valoe Report <br /> <br />The economic benefit of the project is considerable: <br />1) The NRCS estimates the value of property affected to be worth $1.6 million, within <br />the 1600-acre service area <br />2) The short-term value of potential water loss for irrigation for this property in the event <br />the project is not constructed is estimated: @ 2 tons per acre potential production <br />@$100 per ton= $240,000 per year <br />3) The energy saving per sprinkler system estimated at $2500 times 7 systems=$17500 <br />per year. <br />4) Using an estimated total project cost of $210,658+$14,400=$225,058 (to cover <br />design, construction of the pipeline project and all appurtenances, construction <br />supervision, and up to $10,000 in cost overrun), the project cost/benefit ratio is <br />$235,058/ $240,000 per year= .0.97 ratio. <br />
The URL can be used to link to this page
Your browser does not support the video tag.