Laserfiche WebLink
<br />. ~ ~ f -..~ <br /> <br />1994 Master Plan Update <br />Town of Elizabeth <br /> <br />RegulaT maintenance monitoring of the WWTF and equipment should continue. <br />A basic maintenance schedule was suggested in the 1990 WWTF Capacity <br />Study. This maintenance schedule should be continued. The system operator <br />should monitor effluent and treatment efficiencies to determine when cleaning of <br />the aeration lagoons and the polishing pond is necessaTY. <br /> <br />Since this evaluation shows that the WWTF has the capacity for the Town's <br />gTowth thTOUgh the study peTiod (675 SFE), we do not Tecommend new facilities <br />and have not evaluated new treatment facility sites. The 1988 Master Plan <br />identified a preliminary site for a new treatment facility near the confluence of <br />Running Creek and Gold Creek. As growth of the Town and/or loading at the <br />WWTF approaches the limits of the study period or the 80% capacity (635 SFE; <br />0.128 MGD), the Town should conduct another evaluation of the treatment <br />facility capacity. <br /> <br />Meurer & Associates <br />October 5, 1994 <br />Page 13 <br />