Laserfiche WebLink
<br />GRANT <br />MONIES <br /> <br />INSTALLATION <br />JULY 1, 1999 THROUGH JUNE 30, 2000 <br /> <br />MATCHING FUNDS <br />DIRECf <br /> <br />$12,820 <br /> <br />DRAINAGE DITCH CLEANING ($16,025 @ 80120) <br /> <br />$3,205 <br /> <br />15,860 <br /> <br />o <br /> <br />LAND PREPARATION, 30 ACRES@ $40/AC <br /> <br />1,200 <br /> <br />o <br /> <br />WEED CONTROL, 30 ACRES@ $ 15/AC <br /> <br />450 <br /> <br />DRAINAGE PIPE -7,930 FEET; @ $2.50/rr <br />($19,825 @ 80/20) <br /> <br />3,965 <br /> <br />o <br /> <br />LAND PREP ARA TION, 40 ACRE @ $401 AC <br /> <br />1,600 <br /> <br />o <br /> <br />WEED CONTROL, 40 ACRES @ $15/ AC <br /> <br />600 <br /> <br />r- $ 28,680 <br /> <br />TOTAL <br /> <br />$11,020 <br /> <br />II <br />