My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01746
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ01746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
3/8/2007 10:47:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0046FX
Contractor Name
New Castle, Town of
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br /> <br />~ <br />'., <br /> <br />Agenda Item 109. <br />January 24, 1996 <br /> <br />3 <br /> <br />Residents currently pay $16/month for water, and $14/month for sewer. Even if all new debt <br />service had to be repaid from a water rate increase, the new rate would be $21.70. (The <br />average water rate for the State is $33.15). <br /> <br />For 1995, the Town projects $87,000 in water service fees and $252,000 in tap fees will be <br />collected. <br /> <br />The Town of New Castle had a Median Household Income between 80% and 110% of the <br />Statewide MHI for 1990. A loan to the Town should thus be at the "Standard Income" rate of <br />5.25%, set by the CWCB November 1995. <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />1. That a construction fund loan in an amount of $266,250 not to exceed 75% of <br />actual total project costs, be approved for The Town of New Castle (and/or The <br />Water Enterprise for The Town of New Castle) to rehabilitate the Town's Raw <br />Water Pipeline, and <br /> <br />2. That the financing terms shall be at an annual percentage rate of 5.25% <br />(equal to the "Standard Income" rate for a municipality as set by the CWCB <br />November 6, 1995), for a duration of 30 years, and <br /> <br />3. That loan approval shall be contingent upon completion of the feasibility study, <br />and upon all standard contracting provisions of the CWCB, as determined by the <br />CWCB Director, and <br /> <br />4. That security for the loan shall be a collateral interest in the stream of income <br />derived by The Water Enterprise for The Town of New Castle from the sale of <br />water, and a CD in amount equal to one annual payment to be held by the State <br />Treasurer, and <br /> <br />5. That the loan may be used to refinance project costs incurred prior to <br />contracting with the State, if approved by the Director of the CWCB. <br /> <br />Action Taken by the CWCB. January 24.1996 <br /> <br />The CWCB approved the Staff Recommendation. <br /> <br />Attachments <br />C:lwp51 IPROJ-NEWI IOg.jan <br />
The URL can be used to link to this page
Your browser does not support the video tag.