Laserfiche WebLink
<br /> <br />(0:]. <br /> <br />E. Impacts and Pennitting <br /> <br />1. Social, Economic, and Physical Impacts: <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact associated with assuring a supply of <br />water for the Town's residents and businesses. Normal population growth can be <br />acconnnodated, and this growth will provide additional tax base for the Town. <br /> <br />The project will have no significant physical impacts, once construction is complete. <br />Other than the several low impact valve vaults and air relief vents, the entire project will <br />be buried and will not be visible. <br /> <br />2. Permits Required: None required. <br /> <br />3. , No EA or EIS will be required. There are no wetlands along the pipeline route, and <br />the pipeline will be on an existing easement, county road right of way, or on private land. <br /> <br />4. An easement will be required in an area ofre-alienment where the pipeline will be <br />relocated down a street to avoid potential conflict with encroaching residential <br />development in the current easment. <br />