My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Pipeline Environmental Assessment_BRT Approval Letter
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Goodman Point Pipeline Environmental Assessment_BRT Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:19:38 PM
Creation date
3/7/2007 6:19:52 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water Association
Description
Goodman Point Water Association Environmental Report - Preliminary Engineering Report
Account Source
Basin
Board Meeting Date
3/13/2007
Contract/PO #
08000000075
WSRA - Doc Type
Roundtable Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Goodman Point Water Association <br />J.R. Berry, President <br />Keri Mustoe, Vice-President <br />Rodney Evans, Secretary-Treasurer <br />16345 County Road P <br />Cortez, Colorado 81321 <br />Phone: (970) 759-9562 <br />Email:JR.Berry@Hotmail.com <br />November 16, 2006 <br />Southwest Basin, Attn: Steve Harris, Board Chairman <br />Colorado Water Conservation Board <br />Water Supply Reserve Account <br />2007 Grant Application RE: Summary Cover Letter <br />Attached is a Goodman Point Water Association Grant Request. <br />We are requesting $7,700 to complete our funding for an <br />Environmental Report and Preliminary Engineering Report. <br />Total cost of the studies is $30,400. We have $15,200 in grant funding in <br />hand and expect to secure another $7,500 from the USDA-Rural <br />Development. The two studies will be performed by the following <br />companies in partnership: Briliam Engineering Company, The <br />Engineering Company, Woods Canyon Archeological Consultants, and <br />Alta Environmental. <br />The studies will begin in November, 2006 and be completed in the <br />April/May 2007 timeframe. The studies are necessary to negate a <br />negative impact on the environment, pre-historical cultural resource <br />sites, and to develop a general ?scoping? of the project engineering <br />requirements and project costs. They are also necessary to qualify for <br />USDA-Rural Development grant/loan funding. <br />The project that the two studies will support involves extending two of <br />Montezuma Water Company lines that terminate just outside the <br />Goodman Point area. The extension of MWC lines will involve <br />approximately ten miles of new 4? line with associated equipment such <br />as lift pumps, storage tanks, etc. This project will provide the capacity <br />for 100 taps in the Goodman Point area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.