Laserfiche WebLink
<br />- ~ <br /> <br />. <br /> <br />Table 2.1 Summary of flow and nonflow components of the four experimental options under <br />consideration by the Glen Canyon Dam Adaptive Management Program. BASE operations <br />(modified low fluctuating flow regime) are provided for comparison. <br /> <br />. <br /> <br /> Flow/NonOow BASE Option A Option A Option B Option C <br /> Treatment operations Variation <br /> Increased daily No Yes (increased by Yes (increased No Yes <br /> flow 50% to 66% in by 25% to 66% (increased by <br />Flow fluctuations winter months and in all months 50% to 66% <br /> by 25% in summer except April in winter <br /> months) and Mav) months) <br /> No No No Yes, (tests of Yes, <br />Flow Stable tlows 4,8, and 12 (September <br /> months) through <br /> October) <br /> Possible, Yes, as tests under Yes, as tests Yes, as tests Yes, as tests <br />Flow Beachlhabitat- but only sediment input under sediment under under <br /> building flows under triggering input triggering sediment sediment <br /> hydrologic input input <br /> trigl/;ers triggering triggering <br />Flow Alternative No Yes (hourly Yes (hourly No Yes (hourly <br /> ramping rates downramping rate downramping downramping <br /> increased 100% in rate increased rate increased <br /> all months) 100% in Apr- by 100% in <br /> Oct and 167% Nov-Jul <br /> in Nov-Mar ) onlv) <br />Nontlow Temperature No Yes Yes Yes Yes, 2 units <br /> control device assumed <br />Nontlow Control of No Yes, as needed Yes, as needed Yes, as Yes <br /> nonnative needed <br /> coldwater fish <br />Nontlow Control of No Yes, as needed, Yes, as needed, Yes, as Yes, with <br /> nonnative with R&D starting with R&D needed, with R&D starting <br /> warmwater in 2007 starting in 2007 R&D 2007 <br /> Fish starting in <br /> 2007 <br />Nontlow Humpback No Yes Yes Yes Yes, with <br /> chub R&D starting <br /> disease/parasite 2008 <br /> research <br />Nontlow HBC No Yes Yes No Yes <br /> translocation <br />Nonflow Humpback No Yes Yes Possibly Yes <br /> chub refugee s) <br />Nontlow HBC No Yes, Planning Yes, Planning No Yes, <br /> population efforts toward efforts and planning <br /> augmentation implementation, as implementation phase <br /> planning needed <br />Flow and zMini No Yes Possibly Yes Yes <br />Nonflow experiments <br />Experimental Not Reverse Reverse Factorial Forward <br />Design applicable Titration Titration Titration <br /> <br />NOTE: I) For Option C: Ancillary projects not considered part of the main experiment; implementation decision includes consideration of <br />confounding the main experiment. 2) Mini experiments are short-term field experiments that do not confound main experimental treatment <br />effects. For Option C: These experiments are considered undefined concepts and would be incorporated if defined and not in contlict with the <br />main experiment. <br /> <br />. <br /> <br />8 <br />