Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />s <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Ritter, Jr. <br />Governor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Harris D. Shennan <br />Executive Director <br /> <br />FROM: <br /> <br />Randy Seaholm ~ <br />Chief, Water Supply Protection <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />DATE: <br /> <br />January 15,2007 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />SUBJECT: Agenda Item 19, January 23-24, 2007 Board Meeting: <br />Water Supply Protection - Glen Canyon Adaptive Management <br />Program-Long-Term Experimental Plan for the Future Operation of <br />Glen Canyon Dam <br /> <br />Backe:round <br /> <br />The Glen Canyon Adaptive Management Program was implemented in response <br />to the Record of Decision on the Operation of Glen Canyon Dam FEIS, which was done <br />to comply with consultation requirements contained in the 1992 Grand Canyon <br />Protection Act. Recently, the Center for Biodiversity and others filed suit against the <br />Department of Interior regarding operations of Glen Canyon Dam based on a report, <br />"Status of the Colorado River Ecosystem" (SCORE report). It was noted in the SCORE <br />report that there needs to be a focus on the humpback chub and sediment resources <br />because the science seems to indicate that these resources have responded poorly to <br />Modified Low-Fluctuating Flows (MLFF) that was the preferred alternative contained in <br />the 1995 Glen Canyon Dam Operation's EIS. As part of the Settlement Agreement <br />reached in the lawsuit, Reclamation agreed to initiate environmental documentation <br />activities pursuant to NEP A and ESA with respect to modification of current, or other <br />prospective, operations of Glen Canyon Dam and associated management actions of <br />Reclamation and other agencies within the Department of Interior no later than January <br />31,2007. <br />On November 6, 2006, the Department of Interior announced its intent to prepare <br />an EIS on the adoption of a long-tenn experimental plan for the future operation of Glen <br />Canyon Dam and other associated management activities. A Long-Term Experimental <br />Plan is proposed to implement a structured, long-term, program of experimentation <br />