Laserfiche WebLink
<br />.;; <br /> <br />3 <br /> <br /> . Ute Tribe Secures $17.6 M Construction <br />. Contract <br />. Corps to Send River Project Permit <br /> . Proposed Reservoir Discussed, <br /> "Handshake" Agreement on Site <br /> Reached <br /> . SW District to Acquire Water Rights <br /> Yampa and White River Basin (page 48) <br /> . Report: Yampa Project Could Quench <br /> Area's Thirst <br /> Agency Updates (page 49) <br /> . Di Minimis Report <br /> . Instream Flow and Natural Lake Level <br /> Program - Summary of Resolved Cases <br /> . Recently Decreed Instream Flow Water <br /> Rights <br /> . 2007 Instream Flow and Natural Lake <br /> Level Workshop <br /> . CWCB / DOW Cooperative Efforts on <br /> Loans of Water Rights for ISF Use <br /> . CDSS Update <br /> . CWCB Watershed Restoration Program <br /> - Interim Guidelines <br />. . CWCB Flood Protection Section <br /> Assisting with Mitigation Grant <br /> Applications <br /> . Floodstage Newsletter Published <br /> . Weather Modification Updates <br /> . General and Financial Matters <br /> Attachments (page 58) <br /> . De minimis Cases <br /> . Loan Repayment Delinquency Report <br /> . Loan Financial Activity Report <br /> . Loan Forecast & Prospect Report <br /> . Design and Construction Status Report <br /> . Project Summary Spreadsheet <br /> . SEO/CWCB response letter <br /> . WQfWQ Coordination Meeting <br /> Summary <br /> . Memo RE: Governor-Elect Ritter's <br /> Water Agenda <br /> . CDSS 2006 Annual Report <br /> . SPDSS Memos (2) <br /> . Salazar Draft Bill <br />. <br /> 3 <br />